Senoro-Donggi-Matindok Natural Gas Development Project Comprehensive Report : Integrated Analysis from Upstream to Downstream

Introduction

Integrated Analysis from Upstream to Downstream

Source: Author

Upstream Gas Field Development

Gas Fields Supplying Senoro CPP

  1. Senoro Field
  • Location: Senoro-Toili Block, Eastern Central Sulawesi
  • Geology: Miocene carbonate reservoir (Mantawa and Minahaki carbonate sequence)
  • Characteristics: First “giant gas field” in Central Sulawesi
  • Operator: JOB Pertamina-Medco E&P Tomori Sulawesi
  • Discovery year: 2007
  • Reserves: 1.44 TCF (Phase 1)
  1. Toili Field
  • Location: Within Senoro-Toili Block
  • Geology: Similar carbonate structure to the Senoro Field
  • Characteristics: Integrated development with the Senoro Field
  • Operator: JOB Pertamina-Medco E&P Tomori Sulawesi
  • Development method: Integrated production with the Senoro Field
  1. Tiaka Oil Field
  • Location: Within Senoro-Toili Block
  • Type: Oil field (associated gas production)
  • Characteristics: Effective utilisation of associated gas from crude oil production
  • Operator: JOB Pertamina-Medco E&P Tomori Sulawesi
  • Products: Crude oil + associated gas

Gas Fields Supplying Donggi CPP

  1. Donggi Field
  • Location: Toili Barat District, Banggai Regency
  • Geology: Miocene carbonate build-up reservoir
  • Characteristics: High-quality carbonate reservoir
  • Operator: PT Pertamina EP
  • Discovery year: 2008
  • Reserves: 0.70 TCF (part of Matindok Block)
  1. Minahaki Field
  • Location: Toili Barat District (adjacent to Donggi Field)
  • Geology: Similar carbonate structure to Donggi Field
  • Characteristics: Integrated development with Donggi Field
  • Operator: PT Pertamina EP
  • Development method: Integrated production with Donggi Field

Gas Fields Supplying Matindok CPP

  1. Matindok Field
  • Location: Batui District, Banggai Regency
  • Geology: Miocene carbonate reservoir
  • Characteristics: Major gas field bearing the regional name
  • Operator: PT Pertamina EP
  • Reserves: 0.70 TCF for the entire Matindok Block
  • Development stage: Main production gas field
  1. Maleoraja Field
  • Location: Batui District (adjacent to Matindok Field)
  • Geology: Similar structure to Matindok Field
  • Characteristics: Supplementary supply source for Matindok Field
  • Operator: PT Pertamina EP
  • Development method: Integrated production with Matindok Field
  1. Sukamaju Field
  • Location: Batui District
  • Geology: Regional common carbonate reservoir
  • Characteristics: Supply expansion through additional development
  • Operator: PT Pertamina EP
  • Position: Additional supply source for maximising processing capacity

Midstream Processing Facilities (CPP)

Senoro CPP

  1. Basic Specifications
  • Design capacity: 250 MMSCFD
  • Start of operation: June 2015
  • Operator: JOB Pertamina-Medco E&P Tomori Sulawesi
  • Location: Within Senoro-Toili Block
  • Investment: Undisclosed
  1. Main Processing Technologies
  • Acid Gas Removal Unit (AGRU): Using MDEA solvent
  • Dehydration Unit (DHU): Quality improvement through moisture removal
  • Biological Sulfur Recovery Unit (BSRU): Environmental load reduction
  • Condensate separation and treatment system
  • Gas measurement and quality control system
  1. Processing Capacity and Production Performance
  • Design processing capacity: 250 MMSCFD
  • Operating processing capacity: Consistently achieving design values
  • Main products: Refined natural gas, condensate, sulfur
  • Quality standards: LNG manufacturing and ammonia manufacturing specifications

Donggi CPP

  1. Basic Specifications
  • Design capacity: 60 MMSCFD
  • Start of operation: April 2016
  • Operator: PT Pertamina EP
  • Location: Toili Barat District
  • Investment: US$762 million (combined with Matindok CPP)
  1. Main Processing Technologies
  • Acid Gas Removal Unit (AGRU): High impurity compatible specifications
  • Dehydration Unit (DHU): High-efficiency dehydration system
  • Sulfur recovery unit: Environmental response technology
  • Condensate treatment system
  • High-pressure gas compression system
  1. Processing Capacity and Production Performance
  • Design processing capacity: 60 MMSCFD
  • Operating processing capacity: 105 MMSCFD integrated with Matindok CPP
  • Main products: Refined natural gas, condensate (approximately 850 bpd)
  • Quality standards: DSLNG supply specifications

Matindok CPP

  1. Basic Specifications
  • Design capacity: 65 MMSCFD
  • Start of operation: April 2017
  • Operator: PT Pertamina EP
  • Location: Batui District
  • Investment: US$762 million (combined with Donggi CPP)
  1. Main Processing Technologies
  • Acid Gas Removal Unit (AGRU): Latest technology adoption
  • Dehydration Unit (DHU): High-efficiency specifications
  • Biological Sulfur Recovery Unit (BSRU): Environment-conscious type
  • Green Plant technology: Environmental load minimisation
  • Integrated control system: Efficient operation management
  1. Processing Capacity and Production Performance
  • Design processing capacity: 65 MMSCFD
  • Integrated processing capacity: 105 MMSCFD (combined with Donggi CPP)
  • Main products: Refined natural gas, condensate
  • Quality standards: DSLNG supply specifications
  • Integrated supply: Connected to the main pipeline via TIP1/TIP2

Downstream Utilisation Facilities

LNG Facilities

  1. Donggi-Senoro LNG (DSLNG)
  • Processing capacity: 2 MTPA (Million Tonnes Per Annum)
  • Location: Banggai Regency, Central Sulawesi
  • Start of operation: June 24, 2015
  • First shipment: August 2, 2015 (with presidential attendance)
  • Investment: Approximately US$2.5 billion
  1. Gas Supply Structure
  • Senoro CPP supply: 250 MMSCFD
  • Matindok/Donggi integrated supply: 85 MMSCFD
  • Total supply: 335 MMSCFD
  • Supply contract period: Until 2027 (long-term contract)
  1. Technical Specifications
  • Liquefaction technology: Mixed Refrigerant Process
  • Storage tanks: 2 units (160,000m³ each)
  • Shipping facilities: Dedicated jetty and loading arms
  • Annual production: Approximately 2 million tons

Fertiliser Facilities (Ammonia Plant)

  1. PT Panca Amara Utama (PAU)
  • Production capacity: 660,000 tons per year (ammonia)
  • Location: Adjacent to DSLNG Terminal
  • Start of operation: 2013
  • Investment: Approximately US$800 million
  1. Natural Gas Consumption
  • Consumption: 55 MMSCFD
  • Supply source: Senoro CPP
  • Supply method: Via a 23km pipeline
  • Contract period: 13 years (2015-2027)
  1. Production and Sales Structure
  • Main products: Ammonia (fertiliser raw material)
  • Sales market: Domestic market + export
  • Employment creation: Approximately 1,000 people
  • Annual sales: Approximately US$300 million

Power Generation Facilities

  1. PLTMG Luwuk (40 MW)
  • Generation capacity: 40 MW
  • Location: Nonong Village, Banggai Regency
  • Start of operation: January 2025
  • Investment: Rp521 billion (approximately US$35 million)
  1. Power Generation System
  • Number of engines: 5 gas engines
  • Generation method: Gas Engine Power Plant (PLTMG)
  • Fuel: Natural gas (5 MMSCFD)
  • Efficiency: Approximately 8,000-10,000 BTU/kWh
  1. Power Supply Capacity
  • Household supply: 30,000 households
  • Industrial demand: 30 MW
  • Grid connection: 150 kV substations (Luwuk, Batui)
  • CO2 reduction: 75,000 tons per year
  1. Gas Supply Contract
  • Contractor: JOB Tomori (Senoro CPP operator)
  • Supply volume: 5 MMSCFD

Integrated System and Structure

Conclusion